Commissioning of CNC cutting machine mould when installation is complete
by:Transon2020-10-29
CNC cutting machine mould is made up of many parts, so the installation from time to tome special attention when completed to undergo repeated debug 1, the adjustment of the machine, before install, the first thing to adjust the machine performance, the process must be patient and careful, and check the machine whether have dust and used by the iron scraps, etc. , to make the necessary cleaning, late in order to reduce trouble.
2, stroke adjustment, pay attention to check the thickness of the mold and check module is normal, the proportion of the up and down in a normal route for module to control the switch point, you must be aware of this.
3, stroke the adjustment of the module, which is in view of the limit point adjustment module, the module on the high places, the switch is set up, and set aside the slider position, at the same time when the next to slow module, to better protect the machine and cutting machine mold.
Is 4, the adjustment of the gap, the main measurement module and the module in the distance, the specific gap setting is set according to the folding plate.
5, the adjustment of the Angle, the Angle adjustment has a certain relationship with the product, generally 90 ° die, the Angle must be greater than the Angle on both sides of the middle, then its elastic can be done according to the adjusting screw, when bending, can be through the pressure gauge pressure adjustment, avoid blade mould crack.
This article reprinted from laser cutting machine